New DOĞAN YILDIZ 5 m3 to 250 m3 LPG STORAGE TANK gas tank trailer

new DOĞAN YILDIZ 5 m3 to 250 m3 LPG STORAGE TANK  gas tank trailer
Photo: new DOĞAN YILDIZ 5 m3 to 250 m3 LPG STORAGE TANK gas tank trailer
1/17
Compare Add to favourites PDF
Price:
negotiated
Model 5 m3 to 250 m3 LPG STORAGE TANK
Type gas tank trailer
Year of manufacture 2015
Location Turkey Ankara
Placed on more than 1 month
Autoline ID GT4554
Vehicle condition
Vehicle condition new
Description
Colour white
In Stock 19
More details:
115 m3 LPG ABOVE GROUND STORAGE TANK FEATURES
BRAND DOĞAN YILDIZ
TANK TYPE Horizontal Cylindrical
PROJECT CODE AD-MERKBLATTER
DESIGN TEMPERATURE Min -20˚C / max +50˚C
DESIGN PRESURE 17,5 bar
TEST PRESURE 26,5 bar
MATERIAL P355 GH
HEAD TYPE Elliptical
EXTERNAL TANK DIAMETER 3.200 mm
BODY TANK THICKNESS 14 mm
HEAD TANK THICKNESS 16 mm
TOTAL LENGTH OF TANK 15.500 mm
COROSION 1 mm
TANK VOLUME 115 m3
EQUIPMENT TANKS OVER 2” Block Flangeà 2 units àREGO
3” Block Flangeà 3 units àREGO
4" Safety relief Valve 3 units à REGO (MULTIPORT)
Magnetic Level Gauge  1 unit Rochester
1 “ NPT Rotagauge (Rotary Level Indicator) à 1 unit à REGO
Glycerine pressure gauge (0-25 bar), Ø 100 à 1 unit
Thermometer (-30 / 60 ˚ C) Ø100 à 1 unit
Fixed Level Vent Valve (10%-50%-80%) 1 unit à REGO
2” Drain Flange à 1 unit
Manhole 16 “
Blasting and Painting Before painting, the Tank will be sand blasted with SA 2.5 quality undercoat & polyurethane based white topcoat applied providing a total thickness of min. 150 microns.
Control (Inspection and Tests) All tests & inspections mentioned below wiil be carried out under the control of third party & certified by the same authority.
• Checking & approval of design & calculations,
• Material inspection & stamp transferring seperately,
• Visual & dimensional inspection plate orientation,
• Head control,
• Radiographic control,
• Penetrate dye test,
• Hydrostatic test
The reports of the A/M tests & inspections will be presented to the customer together with the inspection certificate of teh tank whicih will be given by the third party after the completion of the tank & the inspections. CONTROL UNION
CERTIFICATION ISO 9001-2008 VE EN 3834-2
WELDING PROCESS All welders are certified according to EN 287-1:2004 standard. Full penetration will be provided in weld seams. Welding will be carried out as submerged arc welding by welders.The Grooves will comply with EN ISO 9692-2. & The Filling Material with EN ISO 14171 & The Flux with EN 760.
HEAT TREATMENT Caps will be treated by heat to relieve the stress.
This offer is for guidance only. Please request more precise information from the seller.
Ask a seller